Reconstruction of Dr. Franjo Tuđman Street in Zadar

For the investor, the City of Zadar, and with financing from European Union funds, works were carried out on the reconstruction of Dr. Franje Tuđmana Street.

The works were divided into two sections and included the reconstruction of utility and transport infrastructure. The scope included electrical installation works, water supply and sewerage works, retaining and boundary walls, as well as the reconstruction of the road itself, including the road body and final pavement layer.

Dr. Franje Tuđmana Street is one of the key transport routes in the wider centre of Zadar, making the project an important contribution to the safety, functionality and traffic flow of the city’s road network.

Project details

Project type: public street

Investor: City of Zadar

Length: 425,00m + 463,50m

The construction was finished in 2022.